manage multiple units

Managing Multiple Units During Construction Phase

Managing the construction of a single home is hard enough, but when multiple units are going up at once, things can get messy fast. Timelines clash, different trades work at different speeds and standards, and changes in one area can cause delays in another. Whether you’re overseeing a few townhouses or a whole strata complex, there’s a lot that can go wrong if everything isn’t managed in sync.

It’s not just about getting the job done. It’s about making sure each unit is built properly, follows current build requirements, and ends up safe and liveable. For property managers and owners in Perth, this becomes even more important during the final stretch of winter, when wet weather can slow things down and make on-site coordination harder. Knowing what to look out for and how to catch problems early is the first step toward keeping things on track.

Planning And Coordination

Multiple unit jobs need straight-up coordination. If you don’t have a solid plan at the start, you risk delays, budget blowouts, and issues down the line. One of the best ways to manage this is to treat each unit like its own micro build, while still sticking to a central master schedule.

Here are some things you’ll want to lock in before any work begins:

1. A clear build timeline that shows key milestones for each unit
2. A list of responsible tradies or subcontractors per unit
3. A plan for shared resources like scaffolding, cranes or forklifts
4. Materials delivery schedules that avoid overlap
5. Agreed communication lines between builders, supervisors and site managers

Be ready to adjust your plan as certain sections finish early or later than expected. It helps to build in buffer days where possible. Having one person accountable for timeline management helps avoid finger-pointing when something slips. They can keep an eye on progress, identify pressure points early, and shuffle trades when needed.

Also, set clear expectations around site access, parking and safety zones. When units are packed tight together, one area running behind can hold up delivery or access for others. Good planning figures out overlaps ahead of time instead of reacting to them.

Regular Inspections And Quality Control

You’ve got builders on the tools, but that doesn’t mean everything is being done to the right standard. This is where building inspections come in, especially when you’re managing multiple units. In Perth, using regular inspection services can help catch building issues before they spread across several dwellings.

When inspections happen during the build (not just at the end), they give you a clearer picture of what’s been finished, what still needs work, and where things might be slipping. Get checks done at each key stage. This might include:

– Footings and slab
– Framing
– Roof install
– Waterproofing
– Electrical and plumbing rough-in
– Final fix and fittings

Watch closely for signs like buckling frames, uneven slab pours or incorrect insulation installs. These sorts of issues often show up on more than one unit if the same trade is handling them across the board. By getting in early, you can deal with problems before they’re repeated on every unit.

A good inspection process also keeps teams accountable and shows you’re paying attention to build quality. It puts less pressure on final handovers and reduces changes or expensive fixes when owners move in. In short, it’s a smart move that protects both the budget and the build standard.

Communication With Residents And Stakeholders

When multiple units are under construction, you’re likely dealing with more than just builders and contractors. Future owners, investors, and even neighbours all want to know how things are tracking. Keeping people in the loop can prevent friction, especially if delays pop up or access becomes limited.

The key is steady, straightforward communication. That doesn’t mean flooding inboxes with updates, but it’s useful to set up a regular rhythm, maybe a fortnightly email or scheduled notice on shared boards. Wherever possible, provide visuals like progress photos along with key milestones and expected next steps. People respond better when they can see what’s been done.

If concerns come up, deal with them early. For example, if construction noise is becoming a problem for nearby residents, work with the site manager to adjust schedules or provide notice when louder tools will be used. Stick to plain language when sharing updates. Technical terms aren’t helpful if no one understands what they mean. Aim to answer two questions whenever you communicate: What’s happening? And how does it affect me?

It may seem like an extra task in a busy project timeline, but proactive engagement can actually save time. When people feel informed, they’re less likely to chase you down with repeated questions or lodge complaints. That means you can focus on keeping the build moving.

Handling Disruptions And Site Safety

Construction rarely goes exactly as planned, especially with Perth’s weather at the tail-end of winter. Rain, equipment delays, or a trade not showing up can throw off your timeline fast. That’s why it helps to map out common problems ahead of time and have a back-up plan for when things shift.

Disruptions might include:

– Wet weather washing out slab pours or frame install days
– Shortages in materials causing supply delays
– Limited access for deliveries and staff on tight sites
– Last-minute regulation changes or required inspections
– Equipment breakdown, especially when shared across units

To limit impact, stagger activities wherever possible instead of stacking every team across all units at once. This gives you some breathing room if something needs to be paused without halting the entire project.

Site safety is just as important. With multiple units and lots of movement, keeping the site hazard-free can get hard fast. Make sure all walkways are clear, temporary fencing is solid, and signage is visible. Where teams overlap, it’s worth beginning each shift with a short toolbox talk to remind workers of the day’s risks.

Another good practice is to have roles clearly defined in case of sudden changes. If a site inspection reveals an issue, who needs to act? If a scaffold goes down, who rearranges the work calendar? Having this sorted up front stops slowdowns from becoming full gridlocks.

Staying on Track Through to the Finish

As every unit nears the finish line, it’s easy to get caught up in handover dates and overlook the small but important details. Wrapping up a multi-unit site well requires more than ticking a box. You’ll need consistent checks, updated documentation, and time for final fixes.

Don’t rely on just a final walkthrough. Stage-by-stage post-construction checks catch things like loose fittings, gaps in exterior seals, or mismatched fixtures early, before keys are handed over. Do this for each unit individually, even if they look the same. One may have copping that wasn’t sealed properly, while the others are fine.

Keep everything documented, from material warranties to inspection reports. If something’s not quite right later on, clear records make it easier to prove what happened and who’s responsible. This also helps with strata management down the track, especially if an issue turns into a wider repair across multiple units.

Take the time to confirm that each unit has passed its relevant inspections and is safe, compliant, and complete. If there’s work still to be done after practical completion, make sure those notes are clear and assigned. Don’t rush this stage. A well-managed finish can save you headaches long after the project ends.

Managing construction for multiple homes at once is never a straight path. But with the right habits, tight planning, clear communication, regular inspections, and a focus on safety, you can get the job done with confidence. Perth’s conditions don’t always make it easy, but keeping track of each build’s progress keeps the whole project on solid ground.

Get peace of mind with expert oversight. Thorough inspections help maintain quality from start to finish. To make sure every stage of your multi-unit construction is tracked and built to standard, look into our detailed under construction inspection services in Perth. ABBC Building Inspectors is here to help you deliver a smooth, well-managed project that stands the test of time.